Revocation of an injunction granted in an emergency relief action that prevented the ANP from resuming, until an arbitral decision, the area subject to a concession contract containing an arbitration clause, on the grounds that: (i) the ordinary action is not linked to the emergency relief action; (ii) the concessionaire refused to advance the costs of the arbitration proceedings, as required by the contract; and (iii) the technical opinion of the regulatory agency (ANP) finding that the requirements for the second phase of the concession contract had not been met is presumed to be legitimate: